Coastal Passenger Terminal
Current status of passenger terminal
- Location : 70, Yeonanbudu-ro, Jung-gu, Incheon (88, Hang-dong, Jung-gu, Incheon)
- Area : Lot : 13,014m2, Building area: 2,507m2, Open storage yard : 8,058m2
- Building /Parking facility : Terminal building(3 stories above ground) / Available ground parking for 264 spaces
- specification of piers : Ship・ 14 Landing stage (9 concurrent berthing)
- Coastal port, 2nd landing stage
- Length 120m, Ship (Landing stage) : Amount 4, Size 30m × 14m × 2.15m
- Coastal port, 3nd landing stage
- Length 150m, Ship (Landing stage) : Amount 5, Size 30m × 14m × 2.15m
- Coastal port, 4nd landing stage
- Length 120m, Ship (Landing stage) : Amount 4, Size 30m × 14m × 2.15m
- Coastal port, Domestic passenger pier
- Length 184m, Water level 11m, Berthing capacity 10,000 DWT
Dock Map
Terminal Internal Structure