본문으로 바로가기

Current status of passenger terminal

  • Location : 70, Yeonanbudu-ro, Jung-gu, Incheon (88, Hang-dong, Jung-gu, Incheon)
  • Area : Lot : 13,014m2, Building area: 2,507m2, Open storage yard : 8,058m2
  • Building /Parking facility : Terminal building(3 stories above ground) / Available ground parking for 264 spaces
  • s​pecification of piers : Ship・ 14 Landing stage (9 concurrent berthing)
  • Coastal port, 2nd landing stage
  • Length 120m, Ship (Landing stage) : Amount 4, Size 30m × 14m × 2.15m
  • Coastal port, 3nd landing stage
  • Length 150m, Ship (Landing stage) : Amount 5, Size 30m × 14m × 2.15m
  • Coastal port, 4nd landing stage
  • Length 120m, Ship (Landing stage) : Amount 4, Size 30m × 14m × 2.15m
  • Coastal port, Domestic passenger pier
  • Length 184m, Water level 11m, Berthing capacity 10,000 DWT

Dock Map

Dock Map

Terminal Internal Structure

Terminal Internal Structure